Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Dec 01, 2023     FF2-3 Cowl Baffles step 1-6 - (4 hours) Category: Engine
Drilled the four pilot holes. Cut the 4" hole. Enlarged two pilot holes with 3/4" step drill as indicated. Deburred all holes and cuts. Scuffed with scotchbrite.
The riveting of the VA-187 flanged duct has been a nightmare as the riveting with the bucking bar results in warped flange. drilled out few rivets, but got three enlarged holes. Used the squeezer and slightly better result, but still some ondulations are there....I had to use -5 rivets as the holes were too big for the -4 rivets. Not super happy but it will work.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.